Concrete Driveway and Patio FAQ, North Phoenix, AZ
Questions worth asking before the pour.
You don’t need to know everything about concrete before calling us. Here are the questions Valley homeowners ask most. If yours isn’t here, ask us on the phone.
Choosing a concrete contractor
Sam The Concrete Man North Phoenix is a locally owned concrete contractor serving the Maricopa County communities within 25 miles of North Phoenix, from its office at 1125 West Myrtle Avenue. Our own crews pour driveways, patios, walkways, pool decks, pads, garage floors and retaining walls and handle repairs, and every job starts with a free on-site estimate and a printed, line-by-line quote.
Sam The Concrete Man North Phoenix repairs cracked driveways across its Maricopa County service area by finding the cause first, usually water under the slab, settled backfill or ground that moves. Sound slabs get crack sealing, leveling or resurfacing, and broken panels are replaced to the nearest joints on a fresh compacted base. The free estimate tells you which repair will last.
Cost and estimates
Plain broom-finished flatwork in the Phoenix area usually runs $7–$12 per square foot installed, with driveways at $8–$12 because they are thicker. Stamped and colored work runs $12–$18 per square foot, and removing an old slab adds $2–$4. Where caliche has to be broken out, it is priced on top, typically $0.50–$2 per square foot. The size of the job, base work for your soil and access move the number, and the cost guide has ranges for every kind of project.
Yes. Every estimate is free and on site, with no obligation, and you get a printed quote with the details of the project and what it costs before any work begins. We measure, look at the grade, the drainage and the ground, and talk through finish options while we are there.
Yes, through Hearth. You can check online whether you prequalify, which takes about a minute, and we can go over it with you at the estimate.
Tear-out and haul-away, excavation, any caliche to break out, the depth of compacted base, slab thickness, the reinforcement (rebar on chairs, with or without mesh), the finish, joints, curing and sealing, cleanup and any permits. If a quote leaves one out, ask, because that is usually where two prices differ.
Mostly because of what is under the slab. A low bid often pours a thin slab on loose fill or over soft ground sitting on caliche, with little or no compacted base and no rebar, and that is the slab that settles and cracks within a few years. Compare quotes line by line: thickness, base depth, reinforcement, caliche and tear-out.
Prices for every kind of project are in the Phoenix concrete cost guide.
Planning your project
Concrete costs more up front and lasts far longer: 30 years or more with good base work, against roughly 20 for asphalt, which also needs sealcoating every few years and softens in summer heat. Both fail early on loose or soft ground without a compacted base, so the base matters more than the material.
Concrete costs less, needs less upkeep and has no sand-filled joints for weeds and ants to move into. Pavers are easier to lift and patch one piece at a time. On ground that settles, a concrete patio built on a compacted base is usually the lower-maintenance choice.
Stamped concrete gives you the look of stone, brick or tile as one solid slab, usually for less than pavers, with no joints for weeds or ants. Under the desert sun it needs resealing every two to three years to keep its color, and a crack shows across the pattern where a joint would have hidden it.
Four inches for walks and patios, four to five for a driveway that sees cars, and six for trucks, trailers and RVs. Edges and aprons where loads come on and off the slab get thickened. Thickness only helps if the base under it is compacted, so ask about both.
Rebar set on chairs at mid-depth is what holds cracks tight and keeps panels level. Wire mesh often ends up trampled to the bottom of the slab, where it does little. Fiber in the mix reduces surface cracking while the concrete is fresh, which helps on hot, dry days, but it does not replace rebar on driveways or anything carrying weight.
Not exactly. New concrete starts darker and lightens over months, and old concrete has years of sun, wear and stains. The clean options are to replace whole panels out to existing joints, to make the new section a deliberate border in a contrasting finish, or to coat the old and new together.
An overlay can renew a slab that is sound and level, as long as the added height works at doors, the garage and the street. If panels have sunk, heaved or broken, the ground under them has moved and an overlay cracks along the same lines. In that case replacement is the honest answer.
Roots under a slab lift it as they grow, which is how many older walks get their trip edges. We plan the layout and base around the tree, reinforce the slab near it, and talk with you before any large root is cut, because cutting the wrong one can harm the tree.
Arizona heat, monsoon and ground
Yes, with hot-weather practice. Summer pours start early in the morning so the concrete is placed and finished before the worst of the heat, the plant can slow the set with a retarder or cool the mix with chilled water, the ground is dampened first, and curing starts the moment finishing ends. If the forecast makes a pour risky, we would rather move the date than compromise the slab.
Fall and spring are the easiest seasons for concrete here, with milder temperatures and no monsoon storms, but we pour year-round. From late spring through September the work is scheduled for early mornings, and during the monsoon we watch the forecast and keep covers on site.
Rain on concrete that has not set washes cement out of the surface and weakens it, so we watch the forecast and don’t pour into a storm. Monsoon season runs from June 15 to September 30, with sudden wind, blowing dust and heavy rain. We keep plastic on site to cover a fresh slab: light rain after the surface is finished does little harm, and if a storm hits mid-pour, the surface gets protected and touched up while it is still workable.
Caliche is soil cemented hard by calcium carbonate, a common problem in southern Arizona soils. It can sit at the surface or below it, as lumps or a solid layer from a few inches to several feet thick. A tight layer won’t let rain or sprinkler water soak through, so water sits on top and softens the soil above it, and caliche that is broken out and thrown back in loose settles under a slab. We dig to firm ground, break out caliche that sits high in the base and haul it off, and build on compacted aggregate base.
Much of the Valley sits on silt, sand and gravel laid down by the rivers and washes. It drains well, but where it is loose and dry and was never compacted, it packs down when it gets wet or carries a load, so slabs sink at corners and along tire lines. Backfill beside houses and pools does the same. Compaction in lifts at the right moisture, with soft soil dug out and replaced, is what keeps a slab level.
In pockets, yes. The soil survey flags some clay-rich soils on the Valley’s fan terraces for shrink-swell. Expansive clay swells when a monsoon storm soaks it after months of dry heat and shrinks as it dries out, and lawns and sprinklers that keep one side of a slab wet make the ground move unevenly. Removing the soft soil, building on compacted aggregate base and keeping water away from the slab’s edges is how a slab survives it.
All concrete shrinks as it cures, and the heat makes slabs expand and contract every day, so some hairline cracking is normal. What we control is where it happens and how wide it gets: control joints no more than about 10 feet apart on a 4-inch slab, cut at least a quarter of the way through, rebar to hold cracks tight, a compacted base so the slab doesn’t move, and curing that starts right after finishing.
Some coloring does. A few dyes aren’t UV-stable and don’t belong outdoors, and sealers wear in the sun and have to be renewed. Integral color, mixed all the way through the concrete, doesn’t fade from weather or sunlight, and acid stain keeps its color as long as the surface stays protected. A non-yellowing, UV-resistant sealer, renewed every few years, keeps colored concrete from washing out.
Permits, HOAs and utilities
It depends on the city and the work. Concrete in the public right-of-way, such as a sidewalk, driveway apron or curb cut, is built to city standards and often needs a permit, and in Phoenix a retaining wall over 3 feet needs one too. Many private patios and walks do not. We tell you which applies before we start, and HOA approval is a separate step we can help with.
Yes. Many Valley neighborhoods have an HOA that reviews driveway widening, colored concrete and new patios before work starts. We put together the drawings, dimensions and finish details the submittal asks for, so the review has what it needs. In a planned community, Arizona law says approval of a project’s plans can’t be unreasonably withheld, but the review still has to happen first.
Arizona law requires finding out where underground utilities are before digging, and Arizona 811 asks for at least two full working days’ notice. The utilities then have up to two working days to mark their lines, and the marks are good for 15 working days. Whoever digs places the request, so on our jobs we file it, and the utilities mark their lines with paint and flags before excavation starts. Private lines, like sprinklers and landscape lighting, aren’t marked, so tell us where they run.
During the job
Most residential projects take a few days on site: tear-out and forming, the pour, and finishing, and a small driveway extension can be done in a day. Curing continues after we leave. We give you the schedule up front, along with how it changes if the heat or a storm does.
Usually not for the whole job. We need clear access for the crew and the truck, vehicles moved off the work area, sprinklers near the forms turned off, and a plan for pets. We go over all of it before the start date.
A loaded ready-mix truck is heavy enough to crack an old driveway, crush landscape borders or break buried irrigation lines, so we plan its route at the estimate. Where it can’t reach the forms safely, the concrete is pumped or wheeled in instead.
Yes. Where equipment can’t get through a side gate, old concrete is broken out by hand and the new concrete is pumped or wheeled in. It takes longer, so the estimate plans for it.
Our own crews. We handle the work in-house, from the estimate to the final walkthrough, so you are not managing several contractors. Sam The Concrete Man North Phoenix is locally owned and operated, and part of a nationwide brand that has been pouring concrete since 1989.
Caring for your concrete
Yes, especially colored, stamped and exposed-aggregate concrete. A sealer protects the color from the desert sun, helps the surface shed water, oil and pool chemicals, and makes cleaning easier. The sealer is what wears, so plan to reseal every two to three years, sooner on surfaces in full sun.
They can. Water that runs under a slab softens the ground and, on caliche, sits on the hardpan with nowhere to drain, and that is where slabs sink and crack. Keep spray heads aimed away from concrete, hold drip emitters and turf back from its edges, and fix leaks near a slab quickly. Tell us where your lines run before we dig, because private lines aren’t marked by 811.
Thirty years or more for a driveway or patio built on a compacted base, with joints in the right places, water steered away from it and the sealer renewed. Most slabs that fail early were poured thin onto loose fill, over soft ground sitting on caliche, or where sprinkler and roof water keep running under them.
Repair or replace
Open joints, chips, pits and isolated cracks can often be caulked, patched or filled, and a small trip edge can be ground flush. A panel that sank in one piece can sometimes be leveled. If panels have broken up or the base has failed, patching on top only buys a year or two. We’ll tell you honestly which one your concrete needs.
Sometimes. Leveling raises a panel that sank in one piece: small holes are drilled and a lifting material is pumped underneath to fill the voids. Mudjacking, with a cement slurry, typically runs $4–$6 per square foot and foam $8–$25. It won’t fix a panel that is broken up, or one that keeps sinking because water runs under it. Those need the base fixed, which means replacing the panel.
Yes. We saw-cut or break out to the nearest joints, fix the base under that section and pour new panels that tie into the old ones. The new concrete won’t match the old color exactly at first, so it helps to plan the cut lines around that.
Panels that rock, sound hollow when tapped, have sunk below their neighbors or tip toward the house are the signs. Water standing in the same spots after a monsoon storm is another. The 30-second check on our home page walks through the rest.
Questions about a specific project
Still have a question?
Call and ask. We’ll give you a straight answer.